Customization: | Available |
---|---|
After-sales Service: | Field Installation, Commissioning and Training |
Warranty: | 2 Years |
Still deciding? Get samples of US$ 5000/set
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
MODEL |
CAPACITY (M3/h) |
FAN |
WATER SPRAYING PUMP |
WEIGHT | DIMENSION(MM) |
||||||
QTY |
POWER (K/W) |
AIR VOLUME PER SET (M3/h) |
QTY |
POWER (K/W) |
WATER VOLUME PER SET (M3/h) |
OPERATING (KG) |
|||||
BHX-30 | 30 | 1 | 3 | 35000 | 1 | 1.1 | 36 | 3790 | 1925 | 2380 | 4220 |
BHX-40 | 40 | 1 | 4 | 45000 | 1 | 1.1 | 45 | 3910 | 1925 | 2380 | 4220 |
BHX-50 | 50 | 1 | 5.5 | 65000 | 1 | 1.1 | 45 | 4340 | 1925 | 2580 | 4220 |
BHX-60 | 60 | 1 | 5.5 | 75000 | 1 | 1.5 | 65 | 5140 | 1925 | 2900 | 4220 |
BHX-70 | 70 | 1 | 7.5 | 87000 | 1 | 1.5 | 65 | 5530 | 1925 | 2900 | 4965 |
BHX-80 | 80 | 2 | 4 | 45000 | 1 | 2.2 | 84 | 7650 | 3770 | 2200 | 4220 |
BHX-90 | 90 | 2 | 4 | 45000 | 1 | 2.2 | 84 | 7930 | 3770 | 2200 | 4720 |
BHX-100 | 100 | 2 | 4 | 45000 | 1 | 2.2 | 84 | 8040 | 3770 | 2200 | 4965 |
BHX-110 | 110 | 3 | 3 | 40000 | 1 | 3 | 120 | 10170 | 4240 | 2200 | 4720 |
BHX-125 | 125 | 3 | 4 | 45000 | 1 | 3 | 120 | 10510 | 4240 | 2200 | 4965 |
BHX-135 | 135 | 4 | 3 | 45000 | 1 | 3 | 120 | 11950 | 5610 | 2200 | 4220 |
BHX-150 | 150 | 4 | 3 | 40000 | 1 | 3 | 120 | 12160 | 5610 | 2200 | 4730 |
BHX-165 | 165 | 4 | 4 | 45000 | 1 | 3 | 120 | 12440 | 5610 | 2200 | 4965 |
BHX-180 | 183 | 4 | 4 | 45000 | 1 | 4 | 170 | 15580 | 7450 | 2200 | 4220 |
BHX-200 | 200 | 4 | 4 | 45000 | 1 | 5.5 | 230 | 15990 | 7450 | 2200 | 4720 |
BHX-225 | 226 | 4 | 4 | 45000 | 1 | 5.5 | 230 | 16210 | 7450 | 2200 | 4965 |
BHX-250 | 250 | 5 | 4 | 45000 | 1 | 5.5 | 230 | 19090 | 9300 | 2200 | 4720 |
BHX-265 | 265 | 5 | 4 | 45000 | 1 | 5.5 | 230 | 19790 | 9300 | 2200 | 4965 |
BHX-280 | 280 | 6 | 4 | 45000 | 1 | 5.5 | 230 | 19930 | 9300 | 2200 | 4965 |
Application | (Explanations: Where the cooling towers will be used for? e.g. for HAVC system, Air Compressors, Melting Furnaces, etc.) |
Water Flow Rate | (Explanations: How many Tons of water required per hour?) |
Inlet Water Temp. | (Explanations: Temperature of hot water to be cooled) |
Outlet Water Temp. | (Explanations: Temperature of cooled water, usually it shall be at least 3~4 °C higher than the wet-bulb temp.) |
Wet-bulb Temp. | (Explanations: Highest wet bulb temp. of the location/area or city to install the tower is essential to know to evaluate the size of towers) |
Power Supply | (Explanations: 380V/3 Phases is standard, which we could have in stock, but for customized towers, the delivery time could be longer) |