Customization: | Available |
---|---|
After-sales Service: | on Line and on-Site |
Warranty: | 24 -72 Months |
Still deciding? Get samples of US$ 2500/Set
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
WHY CHOOSE US
1. Our Cooling towers are CE CTI certified, our company is ISO9001 certified.
2. Cooling towers are 100% tested before shipment.
3. 24 months warranty period
4. Factory price, overseas installation& maintenance service available.
5. Quick response within 12 hours
Model | Capacity (m3/h) |
Fan | PUMP MOTOR | DN(mm) |
DIMENSION | |||||||
length | width | height | ||||||||||
Qty. | Power (KW) |
Air Volume (m3/h) |
Qty. | Power (KW) |
Water Volume m3/h |
|||||||
BHX-30 | 30 | 1 | 3 | 35000 | 1 | 1.1 | 36 | DN80 | 1925 | 2380 | 4220 | |
BHX-40 | 40 | 1 | 4 | 45000 | 1 | 1.1 | 45 | DN100 | 1925 | 2380 | 4220 | |
BHX-50 | 50 | 1 | 5.5 | 65000 | 1 | 1.1 | 45 | DN100 | 1925 | 2580 | 4220 | |
BHX-60 | 60 | 1 | 5.5 | 75000 | 1 | 1.5 | 65 | DN100 | 1925 | 2900 | 4220 | |
BHX-70 | 70 | 1 | 7.5 | 87000 | 1 | 1.5 | 65 | DN100 | 1925 | 2900 | 4965 |
1.Q: Your company is a manufacture or trading company?
A: We have been one of the largest manufacturer of cooling tower,evaporative condenser ,micro channel condenser coils and custom design heat exchanger in China since the year of 1975 with the famous brand-Heng An manufacture in China.
2.Q: How do I get repair parts and how long does it take?
A: We have workshop can supply all parts of the product, and 90% of spare parts can be distributed to any place in the world within one week!
3.Q: What if I don't have the professional engineer to install or maintain the product?
A: We could send experience engineers on site to install the product and train your staff for equipment operation and maintenance.
4.Q: How can I choose a suitable model cooling tower ?
A: As long as you provide the following information, we can help select the model for you.
Application | (Explanations: Where the cooling towers will be used for? e.g. for HAVC system, Air Compressors, Melting Furnaces, etc.) |
Water Flow Rate | (Explanations: How many Tons of water required per hour?) |
Inlet Water Temp. | (Explanations: Temperature of hot water to be cooled) |
Outlet Water Temp. | (Explanations: Temperature of cooled water, usually it shall be at least 3~4 °C higher than the wet-bulb temp.) |
Wet-bulb Temp. | (Explanations: Highest wet bulb temp. of the location/area or city to install the tower is essential to know to evaluate the size of towers) |
Power Supply | (Explanations: 380V/3 Phases is standard, which we could have in stock, but for customized towers, the delivery time could be longer) |