Customization: | Available |
---|---|
Cooling Method: | Combined Flow |
Ventilation Mode: | Mixing Ventilation |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Characteristic of industrial water closed cooling tower
1. Excellent Heat Exchange Performance
the cooling tower adopt the technology of the combination of coil and stuffing to avoid the dry spot and dirt formed on the coils. so the performance of the heat exchanger is dramatically effective.
2. Convenient Maintenance
the cooling tower is designed with access door and reparing ladder. It is easy for technicains to inspect the working condition of the cooling tower.Technicians can enter into the cooling tower during operation time
3. Convenient Transportation and Installation
The cooling tower is designed to be standard upper body part and bottom body part,. It is easy for the transportation and installation of the cooling tower
4.Energy Saving
Variable frequency control ( VFC) is an option for flexible adjustment of the number and speed of working cooling fans to ambient temperature changes, the data of which can be preset at a certain figure. During winter season, the spray water stops automatically when ambient temperature drops to a certain level using only a set number of operating fans to satisfy the reduced cooling requirements.
MODEL |
CAPACITY (M3/h) |
FAN |
WATER SPRAYING PUMP |
INLET/OUTLET DN(MM) |
WEIGHT |
DIMENSION |
|||||||
QTY |
POWER(K/W) |
AIR VOLUME PER SET (M3/h) |
QTY |
POWER (K/W) |
WATER VOLUME PER SET (M3/h) |
SHIPPING (KG) |
OPERATIONG (KG) |
LENGTH (MM) |
WIDTH (MM) |
HEIGHT (MM) |
|||
BHX-30 | 30 | 1 | 3 | 35000 | 1 | 1.1 | 53 | DN80 | 2390 | 3790 | 1925 | 2380 | 4220 |
BHX-40 | 40 | 1 | 4 | 45000 | 1 | 1.1 | 53 | DN100 | 2510 | 3910 | 1925 | 2380 | 4220 |
BHX-50 | 50 | 1 | 5.5 | 65000 | 1 | 1.5 | 70 | DN100 | 2760 | 4340 | 1925 | 2580 | 4220 |
BHX-60 | 60 | 1 | 5.5 | 75000 | 1 | 1.5 | 70 | DN100 | 3290 | 5140 | 1925 | 2900 | 4220 |
BHX-70 | 70 | 1 | 7.5 | 87000 | 1 | 1.5 | 70 | DN100 | 3680 | 5530 | 1925 | 2900 | 4965 |
BHX-80 | 80 | 2 | 4 | 45000 | 1 | 2.2 | 100 | DN100 | 4230 | 7650 | 3770 | 2200 | 4220 |
BHX-90 | 90 | 2 | 4 | 45000 | 1 | 2.2 | 100 | DN125 | 4510 | 7930 | 3770 | 2200 | 4720 |
BHX-100 | 100 | 2 | 4 | 45000 | 1 | 2.2 | 100 | DN125 | 4620 | 8040 | 3770 | 2200 | 4965 |
BHX-110 | 110 | 3 | 3 | 40000 | 1 | 3 | 150 | DN125 | 6170 | 10170 | 4240 | 2200 | 4720 |
BHX-125 | 125 | 3 | 4 | 45000 | 1 | 3 | 150 | 2-DN100 | 6510 | 10510 | 4240 | 2200 | 4965 |
BHX-135 | 135 | 4 | 3 | 45000 | 1 | 4 | 180 | 2-DN100 | 7100 | 11950 | 5610 | 2200 | 4220 |
BHX-150 | 150 | 4 | 3 | 40000 | 1 | 4 | 180 | 2-DN100 | 7310 | 12160 | 5610 | 2200 | 4730 |
BHX-165 | 165 | 4 | 4 | 45000 | 1 | 4 | 180 | 2-DN100 | 7590 | 12440 | 5610 | 2200 | 4965 |
BHX-180 | 183 | 4 | 4 | 45000 | 1 | 5.5 | 233 | 2-DN125 | 8920 | 15580 | 7450 | 2200 | 4220 |
BHX-200 | 200 | 4 | 4 | 45000 | 1 | 5.5 | 233 | 2-DN125 | 9330 | 15990 | 7450 | 2200 | 4720 |
BHX-225 | 226 | 4 | 4 | 45000 | 1 | 5.5 | 233 | 2-DN125 | 9550 | 16210 | 7450 | 2200 | 4965 |
BHX-250 | 250 | 5 | 4 | 45000 | 2 | 4 | 180 | 4-DN100 | 11650 | 19090 | 9300 | 2200 | 4720 |
BHX-265 | 265 | 5 | 4 | 45000 | 2 | 4 | 180 | 4-DN100 | 12350 | 19790 | 9300 | 2200 | 4965 |
BHX-280 | 280 | 6 | 4 | 45000 | 2 | 4 | 180 | 4-DN100 | 12490 | 19930 | 9300 | 2200 | 4965 |
* Techncial Proposal, CAD Drawings, And Documents Supported
* Customerization is available. The company has more than 200 technical staff, more than 60 engineers, has obtained more than 100 patent technology. Heng An is dedicated to provide exceptionally customized products to our clients.
After-Sales Service
* Training how to install and commision the machine, training how to operate the machine.
* Engineers available to service machinery overseas.
* We can offer you the best payment term
* 18 month warranty period
F&Q
1.Q: Your company is a manufacture or trading company?
A: We are a leading cooling tower,evaporative condenser and dry air cooler manufacturer in China since the year of 1975.It is a "famous brand"-Heng An manufacture in China.
2.Q: How do I get repair parts and how long does it take?
A: We have workshop can supply all parts of the product, and 90% of spare parts can be distributed to any place in the world within one week!
3.Q: What if I don't have the professional engineer to install or maintain the product?
A: We could send experience engineers on site to install the product and train your staff for equipment operation and maintenance.
4.Q: How can I choose a suitable model?
A: As long as you provide the following information, we can help select the model for you.
Application: |
(Explanations: Where the cooling towers will be used for? e.g. for HAVC system, Air Compressors, Melting Furnaces, etc.) |
|
Water Flow Rate: | (Explanations: How many Tons of water required per hour?) | |
Inlet Water Temp.: | (Explanations: Temperature of hot water to be cooled) | |
Outlet Water Temp.: |
(Explanations: Temperature of cooled water, usually it shall be at least 3~4 °C higher than the wet-bulb temp.) |
|
Wet-bulb Temp.: | (Explanations: Highest wet bulb temp. of the location/area or city to install the tower is essential to know to evaluate the size of towers) | |
Power Supply: |
(Explanations: 380V/3 Phases is standard, which we could have in stock, but for customized towers, the delivery time could be longer) |