Customization: | Available |
---|---|
After-sales Service: | on-Site Installation |
Warranty: | 2 Years |
Still deciding? Get samples of US$ 3000/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Closed Circuit cooling tower
Technical Database
Combined Flow Cooling TowerMODEL | CAPACITY | FAN | PUMP | DIMENSION | ||||||
QTY | POWER | AIR VOLUM PER SET | QTY | POWER | WATER VOLUME PER SET | L | W | H | ||
BHX-30 | 30 | 1 | 3 | 135000 | 1 | 1.1 | 36 | 1925 | 2380 | 4220 |
BHX-40 | 40 | 1 | 4 | 45000 | 1 | 1.1 | 45 | 1925 | 2380 | 4220 |
BHX-50 | 50 | 1 | 5.5 | 65000 | 1 | 1.1 | 45 | 1925 | 2350 | 4220 |
BHX-60 | 60 | 1 | 5.5 | 75000 | 1 | 1.5 | 65 | 1925 | 2900 | 4220 |
BHX-70 | 70 | 1 | 7.5 | 87000 | 1 | 1.5 | 65 | 1925 | 2900 | 4965 |
BHX-80 | 80 | 2 | 4 | 45000 | 1 | 2.2 | 84 | 3770 | 2200 | 4220 |
BHX-90 | 90 | 2 | 4 | 45000 | 1 | 2.2 | 84 | 3770 | 2200 | 4720 |
BHX-100 | 100 | 2 | 4 | 45000 | 1 | 2.2 | 84 | 3770 | 2200 | 4965 |
BHX-110 | 110 | 3 | 3 | 40000 | 1 | 3 | 120 | 4240 | 2200 | 4720 |
BHX-125 | 125 | 3 | 4 | 45000 | 1 | 3 | 120 | 4240 | 2200 | 4965 |
BHX-135 | 135 | 4 | 3 | 45000 | 1 | 3 | 120 | 5610 | 2200 | 4220 |
BHX-150 | 150 | 4 | 3 | 40000 | 1 | 3 | 120 | 5610 | 2200 | 4730 |
BHX-165 | 165 | 4 | 4 | 45000 | 1 | 3 | 120 | 5610 | 2200 | 4965 |
BHX-183 | 183 | 4 | 4 | 5000 | 1 | 4 | 170 | 7450 | 2200 | 4220 |
BHX-200 | 200 | 4 | 4 | 45000 | 1 | 5.5 | 230 | 7450 | 2200 | 4730 |
BHX-226 | 226 | 4 | 4 | 45000 | 1 | 5.5 | 230 | 7450 | 2200 | 4965 |
BHX-250 | 250 | 5 | 4 | 45000 | 1 | 5.5 | 230 | 9300 | 2200 | 4720 |
BHX-265 | 265 | 5 | 4 | 45000 | 1 | 5.5 | 230 | 9300 | 2200 | 4965 |
BHX-280 | 280 | 6 | 4 | 45000 | 1 | 5.5 | 230 | 9300 | 2200 | 4965 |
ODEL | CAPACITY | FAN | PUMP | DIMENSION | ||||||
QTY | POWER | AIR VOLUM PER SET | QTY | POWER | WATER VOLUME PER SET | L | W | H | ||
BNX-10 | 12 | 1 | 1.5 | 18000 | 1 | 0.55 | 23 | 1230 | 1150 | 3440 |
BNX-20 | 21 | 1 | 2.2 | 30000 | 1 | 0.75 | 28 | 1925 | 1150 | 3650 |
BNX-30 | 33 | 1 | 3 | 45000 | 1 | 0.75 | 28 | 1925 | 1840 | 3840 |
BNX-40 | 42 | 1 | 4 | 60000 | 1 | 1.1 | 45 | 1925 | 1840 | 4220 |
BNX-50 | 51 | 1 | 5.5 | 75000 | 1 | 1.5 | 65 | 2470 | 1840 | 4220 |
BNX-60 | 61 | 1 | 7.5 | 87000 | 1 | 1.5 | 65 | 2470 | 1840 | 4450 |
BNX-70 | 70 | 1 | 7.5 | 10000 | 1 | 2.2 | 84 | 2790 | 1840 | 4450 |
BNX-80 | 80 | 2 | 4 | 65000 | 1 | 2.2 | 84 | 3770 | 1840 | 4220 |
BNX-90 | 90 | 2 | 4 | 65000 | 1 | 2.2 | 84 | 3770 | 1840 | 4450 |
BNX-100 | 100 | 2 | 4 | 65000 | 1 | 2.2 | 84 | 3770 | 1840 | 4220 |
BNX-110 | 110 | 2 | 5.5 | 75000 | 1 | 3 | 120 | 3770 | 2200 | 4450 |
BNX-125 | 125 | 2 | 5.5 | 75000 | 1 | 3 | 120 | 3770 | 2200 | 4350 |
BNX-135 | 135 | 2 | 5.5 | 87000 | 1 | 4 | 170 | 4846 | 2200 | 4650 |
BNX-150 | 150 | 2 | 7.5 | 100000 | 1 | 4 | 170 | 4846 | 2200 | 4350 |
BNX-165 | 165 | 3 | 4 | 65000 | 1 | 4 | 170 | 5610 | 2200 | 4650 |
BNX-180 | 183 | 3 | 5.5 | 75000 | 1 | 4 | 170 | 5610 | 2200 | 4650 |
BNX-200 | 200 | 3 | 5.5 | 75000 | 1 | 4 | 170 | 6046 | 2200 | 4650 |
BNX-225 | 225 | 3 | 7.5 | 87000 | 1 | 5.5 | 230 | 7230 | 2200 | 4650 |
BNX-250 | 250 | 4 | 5.5 | 75000 | 2 | 3 | 120 | 7450 | 2200 | 4650 |
BNX-265 | 265 | 4 | 5.5 | 75000 | 2 | 4 | 170 | 9030 | 2200 | 4965 |
BNX-280 | 280 | 4 | 5.5 | 75000 | 2 | 4 | 170 | 9030 | 2200 | 4965 |
Production Process
HACST is a leading global manufacturer of cooling towers, evaporative condensers and air-cooled heat exchangers.Providing full-service cooling solutions and support to customers in the heating, industrial, refrigeration and process cooling markets in China since the year of 1975.
HACST is a state level high-tech enterprise and one of the largest heat exchanger manufacturers in China, with a state-level testing laboratory and three large plants. It's the first one in the industry gets ISO9001 Quality Management System Certification and TS16949 Quality Management System Certification.
CERTIFICATIONShipment Procedures
Projects
1 Q: Is your company a manufacture or a trading company?
A: We are a leading cooling tower manufacturer and trading combo with more than 40 years producing experience since 1975.
The famous brand-"Heng An" is well known not only China but all over the world.
As a group company loacted in Weifang Citey of China, we have more than 1000 employees, area of 34hectares and total assets of USD 160 million.
2 Q: What is the difference between a "counter flow" and a "cross flow" cooling tower?
A: The cross flow or counter flow designation characterizes the orientation of the airflow within the heat-transer medium (fill) in the tower with respect to the direction of water flow. In counter flow towers air travels vertically upwards through the fill and makes intimate contact with water droplets falling down through the fill. Hence the air and water travel in opposite directions.
In cross flow cooling tower, the air passes through the fill medium in a horizontal direction, thus crossing the downward water flow.
At same situation, counter flow tower are inherently more efficient than cross flow tower.
3 Q: How do you get repair parts and how long does it take?
A: We have workshop and backup store supplying all parts. 90% of spare parts can be distributed to any plae on the world within one week.
4 Q: What if you don't have the professional engineers to install or maintain the tower?
A: We could dispatch experienced engineer on site to install the towers and train your staff for tower operation and maintaince.
5 Q: How can I choose a suitable cooling tower?
A: If you are available to provide the following information, we can help you to choose the suitable cooling tower.
Application | Which industry or system using for? For example, HAVC system, casting cooling system |
Water flow capacity | How many tons of water treatment per hour? |
Inlet water temp. | Tempreture of hot water to be cooled |
Outlet water temp. | Tempreture of cooled water, usually it would be at least 3-4 ºC higher than the bulb tempreture. |
Wet bulb temp. | Highest wet bulb temp. of the location/area or city to install the tower is essential to know to evaluate the size of towers. |
Power supply | The standard is 380V/3 phases and we have stock. But for customization, the delivery time would be longer. |