Advanced Water Distribution Counter Flow Water Cooling Tower for Casting Workshop

Product Details
Customization: Available
After-sales Service: Video Technical Support, Field Maintenance Repair
Warranty: 2 Years
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (22)
  • Advanced Water Distribution Counter Flow Water Cooling Tower for Casting Workshop
  • Advanced Water Distribution Counter Flow Water Cooling Tower for Casting Workshop
  • Advanced Water Distribution Counter Flow Water Cooling Tower for Casting Workshop
  • Advanced Water Distribution Counter Flow Water Cooling Tower for Casting Workshop
  • Advanced Water Distribution Counter Flow Water Cooling Tower for Casting Workshop
  • Advanced Water Distribution Counter Flow Water Cooling Tower for Casting Workshop
Find Similar Products
  • Overview
  • Product Description
  • Our Advantages
  • After Sales Service
  • Packaging & Shipping
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
BNX-200
Cooling Method
Counter Flow
Ventilation Mode
Mechanical Ventilation
Material
Metal
Air Contact Form
Wet
Air Contact Way
Closed
Tower Shape
Square
Noise Level
Ultra Quiet
Application Fields
Industrial
Certification
ISO, CE, CTI
Condition
New
Fan Air Volume
3-80000cbm/H
Fan Power
3-5.5kw
Water Spraying Pump Power
5.5kw
Spraying Water Pump Water Volume
233cbm/H
Shipping Weight
9420kg
Operating Weight
13460kg
Dimension
6046X2380X4550mm
Inlet/Outlet DN
4-DN100
Coil Tube Thickness
1.5mm, Customized
Coil Material
SS304
Casing Material
SS304
Motor Model
Weg/Siemens/ABB
PVC Fill Thickness
2mm
Transport Package
Sea Shipping
Specification
201cbm/h
Trademark
HACST
Origin
China
HS Code
8418699090
Production Capacity
5000set/Year

Packaging & Delivery

Package Size
2500.00cm * 1840.00cm * 2000.00cm
Package Gross Weight
3000.000kg

Product Description

Advanced water distribution counter flow water cooling tower for casting workshop

Product Description

For BNX series counter flow type closed circuit cooling tower,the fresh air intakes from bottom air inlet,and will become
saturated hot air mixed with spraying water as they flow in reverse direction .

The heat will be exhausted out by fans ,but the water will be collected to water basin for secondary spraying by its special
designed drift eliminator.

As no infill inside,BNX series cooling tower has much space to enlarge its coil unit heat rejection area,
the structure is more compact and requires less footprint .

Especially,its suitable to the fluid with high temperature.

Advanced Water Distribution Counter Flow Water Cooling Tower for Casting Workshop

Advanced Water Distribution Counter Flow Water Cooling Tower for Casting WorkshopAdvanced Water Distribution Counter Flow Water Cooling Tower for Casting WorkshopAdvanced Water Distribution Counter Flow Water Cooling Tower for Casting WorkshopAdvanced Water Distribution Counter Flow Water Cooling Tower for Casting WorkshopAdvanced Water Distribution Counter Flow Water Cooling Tower for Casting Workshop
 

Our Advantages

Product characteristics:

1.No infill designed ,more compact structure ,lower profile,less installation required,and easy for transport and installation.

2.Suitable to secere environment as its structure much more close ,which could prevent from sand and dust.
So it widely used for casting workshop ,mining factory etc.

3.Suitable for high temperature fluid,because hot spraying water will not distort PVC fill as no PVC fill designed.

4.Freezing resistance,because there is no PVC fill to slow down spraying water flow speed .

 

 

Advanced Water Distribution Counter Flow Water Cooling Tower for Casting Workshop

After Sales Service

Video technical support
Online support
Spare parts 
Field maintenance and repair service

Packaging & Shipping
 

Advanced Water Distribution Counter Flow Water Cooling Tower for Casting WorkshopAdvanced Water Distribution Counter Flow Water Cooling Tower for Casting Workshop
 

Company Profile

Advanced Water Distribution Counter Flow Water Cooling Tower for Casting Workshop

Advanced Water Distribution Counter Flow Water Cooling Tower for Casting WorkshopAdvanced Water Distribution Counter Flow Water Cooling Tower for Casting Workshop

FAQ

1.Q: Your company is a manufacture or trading company?
A: We are a leading cooling tower manufacturer for 40 years .It is a "famous brand "-Hengan Group.
2.Q: How do I get repair parts and how long does it take?
A: We have workshop can supply all parts of the product, and 90% of spare parts can be distributed to any place in the world within one week!
3.Q: What if I don't have the professional engineer to install or maintain the product?
A: We could send experience engineers on site to install the product and train your staff for equipment operation and maintenance.
4.Q: How can I choose a suitable model?
 A: As long as you provide the following information, we can help select the model for you.
 

Application:

(Explanations: Where the cooling towers will be used for?

 e.g. for HAVC system, Air Compressors, Melting Furnaces, etc.)

Water Flow Rate: (Explanations: How many Tons of water required per hour?)
Inlet Water Temp.: (Explanations: Temperature of hot water to be cooled)
Outlet Water Temp.:

(Explanations: Temperature of cooled water, 

usually it shall be at least 3~4 °C higher than the wet-bulb temp.) 

 Wet-bulb Temp.: (Explanations: Highest wet bulb temp. of the location/area or city to install the tower is essential to know to evaluate the size of towers)
Power Supply:

(Explanations: 380V/3 Phases is standard, which we could have

 in stock, but for customized towers, the delivery time could be longer)

 

WHy Choose Us ?

1. Products are certified by ISO and CE.

2. Strictly performance test and commissioning test before shipment

3. 18 months warranty period4. You can get the best factory price and overseas service available
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier