Customization: | Available |
---|---|
After-sales Service: | Video Technical Support,Field Maintenance Repair |
Warranty: | 2 Years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
For ZHX series combined flow type evaporative condenser ,the coil will soaked fully by spraying water when process fluid
flows inside ,meanwhile ,the heat of working fluid will be tranferred by wall of coil tube ,and become saturated wet-hot
vapor after mixed with water and air ,then it will be discharged into atmosphere by fan ,but water will be collected into water
basin by drift eliminator for recycled spraying,low water consumption.The spraspraying water temp. will be reduced by PVC
infill during the recycling.and it flows in same direction to fresh air,to cool coil mainly by snesible heat conduction way.
Application and Fields
1.Excellent Heat Exchange Performance
Parallel air and water path as well as the combination of coils and PVC fill,this effectively avoid the dry spot and
scal formation,and improve the heat exchange performance.
2.Convenient Maintenance
Huge maintenance space makes it convenient to inspect the product.Technicians can enter the cooling tower during
the operation time.
3.Convenient trasportaion and installation
The evaporative condenser is designed tp be standard upper body part and bottom body part,make it is able to be
shipped saperately and saves transportation and installation cost.
4.Slope water basin design
Suspended PVC fill and sloped watrer basin floor toward the drain facilitate cleaning.
Video technical support
Online support
Spare parts
Field maintenance and repair service
1.Q: Your company is a manufacture or trading company?
A: We are a leading cooling tower manufacturer for 40 years .It is a "famous brand "-Hengan Group.
2.Q: How do I get repair parts and how long does it take?
A: We have workshop can supply all parts of the product, and 90% of spare parts can be distributed to any place in the world within one week!
3.Q: What if I don't have the professional engineer to install or maintain the product?
A: We could send experience engineers on site to install the product and train your staff for equipment operation and maintenance.
4.Q: How can I choose a suitable model?
A: As long as you provide the following information, we can help select the model for you.
Application: |
(Explanations: Where the cooling towers will be used for? e.g. for HAVC system, Air Compressors, Melting Furnaces, etc.) |
|
Water Flow Rate: | (Explanations: How many Tons of water required per hour?) | |
Inlet Water Temp.: | (Explanations: Temperature of hot water to be cooled) | |
Outlet Water Temp.: |
(Explanations: Temperature of cooled water, usually it shall be at least 3~4 °C higher than the wet-bulb temp.) |
|
Wet-bulb Temp.: | (Explanations: Highest wet bulb temp. of the location/area or city to install the tower is essential to know to evaluate the size of towers) | |
Power Supply: |
(Explanations: 380V/3 Phases is standard, which we could have in stock, but for customized towers, the delivery time could be longer) |