Customization: | Available |
---|---|
After-sales Service: | Video Technical Support, Field Maintenance Repair |
Warranty: | 2 Years |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Principle of Operation
The process fluid to be cooled is circulated within a serpentine cooling coil,which is continually wetted on the outside by the spraying water system.
The heat is transferred by the wall of coil,becomes saturated steam when it meets spray water and air.Then the heat will be discharged into atmosphere by fan,but water will be collected in the basin by drift eliminator for recirculated spraying.The temperature of spraying water is reduced by PVC fill,spraying water flows in the same direction as the fresh air,to cool coil mainly by significant heat conduction way,which is especially suitable to the cases when cooling tower outlet temperature is much closer to the wet bulb temperature.
Product characteristics:
1.Excellent Heat Exchange Performance
Parallel air and water path as well as the combination of coils and PVC fill,this effectively avoid the dry spot
and scal formation,and improve the exchange heat perrformance
2.Convenient Maintnance
Huge maintenance space makes it convenient to inspect the product.Techanicians can enter the cooling tower
during opration time.
3.Convenient Transportation and installation
The cooling tower is designed to be standard upper body part and bottom body part,making it is shipped saperately
and saves transportation and installation cost.
4.Slope water basin design
Suspended PVC fill and sloped water basin floor toward the drain facilitate cleaing.
Video technical support
Online support
Spare parts
Field maintenance and repair service
1.Q: Your company is a manufacture or trading company?
A: We are a leading cooling tower manufacturer for 40 years .It is a "famous brand "-Hengan Group.
2.Q: How do I get repair parts and how long does it take?
A: We have workshop can supply all parts of the product, and 90% of spare parts can be distributed to any place in the world within one week!
3.Q: What if I don't have the professional engineer to install or maintain the product?
A: We could send experience engineers on site to install the product and train your staff for equipment operation and maintenance.
4.Q: How can I choose a suitable model?
A: As long as you provide the following information, we can help select the model for you.
Application: |
(Explanations: Where the cooling towers will be used for? e.g. for HAVC system, Air Compressors, Melting Furnaces, etc.) |
|
Water Flow Rate: | (Explanations: How many Tons of water required per hour?) | |
Inlet Water Temp.: | (Explanations: Temperature of hot water to be cooled) | |
Outlet Water Temp.: |
(Explanations: Temperature of cooled water, usually it shall be at least 3~4 °C higher than the wet-bulb temp.) |
|
Wet-bulb Temp.: | (Explanations: Highest wet bulb temp. of the location/area or city to install the tower is essential to know to evaluate the size of towers) | |
Power Supply: |
(Explanations: 380V/3 Phases is standard, which we could have in stock, but for customized towers, the delivery time could be longer) |
WHy Choose Us ?
1. Products are certified by ISO and CE.
2. Strictly performance test and commissioning test before shipment
3. 18 months warranty period4. You can get the best factory price and overseas service available