Industrial Water Energy Saving Adiabatic Cooler

Product Details
Customization: Available
After-sales Service: on Line and One Site
Warranty: 24 to 72 Months
Still deciding? Get samples of $ !
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (22)
  • Industrial Water Energy Saving Adiabatic Cooler
  • Industrial Water Energy Saving Adiabatic Cooler
  • Industrial Water Energy Saving Adiabatic Cooler
  • Industrial Water Energy Saving Adiabatic Cooler
  • Industrial Water Energy Saving Adiabatic Cooler
  • Industrial Water Energy Saving Adiabatic Cooler
Find Similar Products

Basic Info.

Model NO.
adiabatic cooler
Cooling Method
Counter Flow
Ventilation Mode
Mixing Ventilation
Material
Metal
Air Contact Form
Wet and Dry
Air Contact Way
Closed
Tower Shape
Square
Noise Level
Low
Application Fields
Industrial
Certification
UR, ISO, CE
Condition
New
Manufacturer
Weifang Heng an Group
Applications
Industrial Water Enhance Cooling
Coil Material
Stainless Steel/Hot-DIP Al-Zn Alloy-Coated Steel S
Maintenance
with Access Door and Ladder
Water Pump Motor
Protection Class IP55, Insulation Class F
Character
Energy Saving and Easy Maintainance
Products Name
Industrial Water Energy Saving Adiabatic Cooler
Drift Rate
Less Than 0.001%
Warranty Period
24-72 Months
Fan Model
Axial Flow Type, Low Noise
Transportation
by Container and Assembly at Site
Fan Motor
Siemens Weg ABB
Dimension
4260*2200*4760
After Sales Service
Life Warranty Period
Lead Time
25-45 Days
Transport Package
Sea Transportation Container
Specification
adiabatic cooler
Trademark
HACST
Origin
China
HS Code
8418699090
Production Capacity
2050 Sets / Annual

Packaging & Delivery

Package Size
745.00cm * 220.00cm * 245.00cm
Package Gross Weight
3550.000kg

Product Description

 Industrial Water Energy Saving Adiabatic Cooler

WHY CHOOSE US

1. Our Cooling towers are CE certified, our company is ISO9001 certified.

2. DRY Cooling towers are 100% tested before shipment.

3. 24 months warranty period

4. Factory price, overseas installation& maintenance service available.

5. Quick response within 12 hours

Industrial Water Energy Saving Adiabatic Cooler




Industrial Water Energy Saving Adiabatic CoolerIndustrial Water Energy Saving Adiabatic CoolerIndustrial Water Energy Saving Adiabatic CoolerIndustrial Water Energy Saving Adiabatic Cooler
Industrial Water Energy Saving Adiabatic CoolerIndustrial Water Energy Saving Adiabatic Cooler

   Industrial water energy saving dry model air cooling heat exchanger cooling tower



Industrial Water Energy Saving Adiabatic Cooler
Industrial Water Energy Saving Adiabatic Cooler
 

FAQ

 1.Q: Your company is a manufacture or trading company?
A: We have been one of the largest manufacturer of aluminum and copper raidator , cooling tower,evaporative condenser ,micro channel condenser coil and adiabatic cooler in China since the year of 1975. It is a "famous brand"-Heng An manufacture in China.
2.Q: How do I get repair parts and how long does it take?
A: We have workshop can supply all parts of the product, and 90% of spare parts can be distributed to any place in the world within one week!
3.Q: What if I don't have the professional engineer to install or maintain the product?
A: We could send experience engineers on site to install the product and train your staff for equipment operation and maintenance.
4.Q: How can I choose a suitable model cooling tower ?
    A: As long as you provide the following information, we can help select the model for you.

Application (Explanations: Where the cooling towers will be used for?
 e.g. for HAVC system, Air Compressors, Melting Furnaces, etc.)
Water Flow Rate (Explanations: How many Tons of water required per hour?)
Inlet Water Temp. (Explanations: Temperature of hot water to be cooled)
Outlet Water Temp. (Explanations: Temperature of cooled water, 
usually it shall be at least 3~4 °C higher than the wet-bulb temp.) 
 Wet-bulb Temp. (Explanations: Highest wet bulb temp. of the location/area or city to install the tower is essential to know to evaluate the size of towers)
Power Supply (Explanations: 380V/3 Phases is standard, which we could have
 in stock, but for customized towers, the delivery time could be longer)

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier