Customization: | Available |
---|---|
After-sales Service: | Video Technical Support,Field Maintenance Repair |
Warranty: | 2 |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Advantage of evaporative cooling tower
1. Excellent Heat Exchange Performance
the cooling tower adopt the technology of the combination of coil and stuffing to avoid the dry spot and dirt formed on the coils. so the performance of the heat exchanger is dramatically effective.
2. Convenient Maintenance
the cooling tower is designed with access door and reparing ladder. It is easy for technicains to inspect the working condition of the cooling tower.Technicians can enter into the cooling tower during operation time
3.. Convenient Transportation and Installation
The cooling tower is designed to be standard upper body part and bottom body part,. It is easy for the transportation and installation of the cooling tower
Technical Data of indirect evaporative cooling tower
Model |
Capacity (kw) |
Fan | Water Spray Pump | Weight (KG) |
Size (mm) |
Inlet/Outlet DN (mm) |
BHX-30 | 192 | 1*3kw | 1*1.1kw | 2390 | 1925*2380*4220 | DN80 |
BHX-50 | 297 | 1*5.5kw | 1*1.1kw | 2760 | 1925*2580*4220 | DN100 |
BHX-100 | 612 | 2*4kw | 1*2.2KW | 4620 | 3770*2200*4220 | DN125 |
BHX-150 | 886 | 4*3kw | 1*3kw | 7310 | 5610*2200*4220 | 2-DN125 |
BHX-200 | 1172 | 4*4kw | 1*5.5kw | 9330 | 7450*2200*4720 | 2-DN125 |
BHX-250 | 1458 | 5*4kw | 1*5.5kw | 11650 | 9300*2200*4720 | 2-DN125 |
WHy Choose Us ?
1. Products are certified by ISO and CE.
2. Strictly performance test and commissioning test before shipment
3. 18 months warranty period
4. You can get the best factory price and overseas service available
Packaging & Shipping
Company Information
1.Q: Your company is a manufacture or trading company?
A: We are a leading cooling tower manufacturer for 40 years. It is a "famous brand"-Heng An manufacture in China.
2.Q: How do I get repair parts and how long does it take?
A: We have workshop can supply all parts of the product, and 90% of spare parts can be distributed to any place in the world within one week!
3.Q: What if I don't have the professional engineer to install or maintain the product?
A: We could send experience engineers on site to install the product and train your staff for equipment operation and maintenance.
4.Q: How can I choose a suitable model?
A: As long as you provide the following information, we can help select the model for you.
Application: |
(Explanations: Where the cooling towers will be used for? e.g. for HAVC system, Air Compressors, Melting Furnaces, etc.) |
|
Water Flow Rate: | (Explanations: How many Tons of water required per hour?) | |
Inlet Water Temp.: | (Explanations: Temperature of hot water to be cooled) | |
Outlet Water Temp.: |
(Explanations: Temperature of cooled water, usually it shall be at least 3~4 °C higher than the wet-bulb temp.) |
|
Wet-bulb Temp.: | (Explanations: Highest wet bulb temp. of the location/area or city to install the tower is essential to know to evaluate the size of towers) | |
Power Supply: |
(Explanations: 380V/3 Phases is standard, which we could have in stock, but for customized towers, the delivery time could be longer) |