Customization: | Available |
---|---|
After-sales Service: | on Line and on-Site |
Warranty: | 24 Months to 72 Months |
Still deciding? Get samples of US$ 2500/Set
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
WHY CHOOSE US
1. Our Cooling towers are CE certified, our company is ISO9001 certified.
2. DRY Cooling towers are 100% tested before shipment.
3. 24 months warranty period
4. Factory price, overseas installation& maintenance service available.
5. Quick response within 2-12 hours
1.Q: Your company is a manufacture or trading company?
A: We are a leading cooling tower manufacturer for 40 years. It is a "famous brand"-Heng An manufacture in China.
2.Q: How do I get repair parts and how long does it take?
A: We have workshop can supply all parts of the product, and 90% of spare parts can be distributed to any place in the world within one week!
3.Q: What if I don't have the professional engineer to install or maintain the product?
A: We could send experience engineers on site to install the product and train your staff for equipment operation and maintenance.
4.Q: How can I choose a suitable model cooling tower ?
A: As long as you provide the following information, we can help select the model for you.
Application | (Explanations: Where the cooling towers will be used for? e.g. for HAVC system, Air Compressors, Melting Furnaces, etc.) |
Water Flow Rate | (Explanations: How many Tons of water required per hour?) |
Inlet Water Temp. | (Explanations: Temperature of hot water to be cooled) |
Outlet Water Temp. | (Explanations: Temperature of cooled water, usually it shall be at least 3~4 °C higher than the wet-bulb temp.) |
Wet-bulb Temp. | (Explanations: Highest wet bulb temp. of the location/area or city to install the tower is essential to know to evaluate the size of towers) |
Power Supply | (Explanations: 380V/3 Phases is standard, which we could have in stock, but for customized towers, the delivery time could be longer) |