CTI Closed Cooling Tower Cooling for Furnance Cooling

Product Details
Customization: Available
Cooling Method: Mixed Flow
Ventilation Mode: Mechanical Ventilation
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment methods: visa mastercard discover JCB diners club american express T/T
  Support payment in USD
Secure payments: Every payment you make at Made-in-china.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (22)
  • CTI Closed Cooling Tower Cooling for Furnance Cooling
  • CTI Closed Cooling Tower Cooling for Furnance Cooling
  • CTI Closed Cooling Tower Cooling for Furnance Cooling
  • CTI Closed Cooling Tower Cooling for Furnance Cooling
  • CTI Closed Cooling Tower Cooling for Furnance Cooling
  • CTI Closed Cooling Tower Cooling for Furnance Cooling
Find Similar Products
  • Overview
  • Product Description
  • Our Advantages
  • Product Parameters
  • Packaging & Shipping
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
BHX-50
Air Contact Form
Wet
Air Contact Way
Closed
Tower Shape
Square
Noise Level
Ultra Quiet
Application Fields
Industrial
Certification
RoHS, ISO, CE, CCC, CTI
Condition
New
Name
Closed Cooling Tower
Casing
SS304/Az150/Galvanized Steel /FRP
Coils
HDG/SS304/Copper
Application
Cooling Medium
Transport Package
Standard Export Package
Specification
150m³ /h
Trademark
HACST
Origin
China
HS Code
8418699090
Production Capacity
5000set/Year

Packaging & Delivery

Package Size
3770.00cm * 2200.00cm * 4965.00cm
Package Gross Weight
11050.000kg

Product Description

Product Description

CTI Closed Cooling Tower Cooling for Furnance cooling 

CTI Closed Cooling Tower Cooling for Furnance CoolingCTI Closed Cooling Tower Cooling for Furnance CoolingCTI Closed Cooling Tower Cooling for Furnance CoolingCTI Closed Cooling Tower Cooling for Furnance CoolingCTI Closed Cooling Tower Cooling for Furnance CoolingCTI Closed Cooling Tower Cooling for Furnance Cooling
Our Advantages
 

 

1. Excellent Heat Exchange Performance

the cooling tower adopt the technology of the combination of coil and stuffing to avoid the dry spot  and dirt formed on the coils. so the performance of the heat exchanger is drama

tically effective. 

 

2. Convenient Maintenance

the cooling tower is designed with access door and reparing ladder. It is easy for technicains to inspect the working condition of the cooling tower.Technicians can enter into the cooling tower during operation time 

 

3.. Convenient Transportation and Installation

The cooling tower is designed to be standard upper body part and bottom body part,. It is easy for the transportation and installation of the cooling tower


 

Product Parameters

 

Model 

Capacity 

(kw)

Fan Water Spray Pump Weight
(KG) 
Size
(mm) 

Inlet/Outlet DN

(mm)

BHX-30 192 1*3kw 1*1.1kw 2390 1925*2380*4220 DN80
BHX-50 297 1*5.5kw 1*1.1kw 2760 1925*2580*4220 DN100
BHX-100 612 2*4kw 1*2.2KW 4620 3770*2200*4220 DN125
BHX-150 886 4*3kw 1*3kw 7310 5610*2200*4220 2-DN125
BHX-200 1172 4*4kw 1*5.5kw 9330 7450*2200*4720 2-DN125
BHX-250 1458 5*4kw 1*5.5kw 11650 9300*2200*4720 2-DN125

WHy Choose Us ?

1. Products are certified by ISO and CE.

2. Strictly performance test and commissioning test before shipment

3. 18 months warranty period

4. You can get the best factory price and overseas service available

CTI Closed Cooling Tower Cooling for Furnance Cooling
CTI Closed Cooling Tower Cooling for Furnance Cooling
CTI Closed Cooling Tower Cooling for Furnance CoolingCTI Closed Cooling Tower Cooling for Furnance CoolingCTI Closed Cooling Tower Cooling for Furnance CoolingCTI Closed Cooling Tower Cooling for Furnance Cooling


 

Packaging & Shipping

 


CTI Closed Cooling Tower Cooling for Furnance Cooling

Company Profile

 



 Weifang Hengan Group Co. Ltd is a professional evaporative condenser, cooling towers manufacturers, who located in Weifang City, Shandong Province of China. We are a large group company with rich producing and exporting experience for years, we supply top class products and service for clients from all over the world, and be the cooperation partner of many world famous large companies and enterprises. We looking forward to our cooperation. 

CTI Closed Cooling Tower Cooling for Furnance Cooling

CTI Closed Cooling Tower Cooling for Furnance Cooling

FAQ

 


 

1.Q: Your company is a manufacture or trading company?
A: We are a leading cooling tower manufacturer for 40 years. It is a "famous brand"-Heng An manufacture in China.
2.Q: How do I get repair parts and how long does it take?
A: We have workshop can supply all parts of the product, and 90% of spare parts can be distributed to any place in the world within one week!
3.Q: What if I don't have the professional engineer to install or maintain the product?
A: We could send experience engineers on site to install the product and train your staff for equipment operation and maintenance.

4.Q: How can I choose a suitable model?
    A: As long as you provide the following information, we can help select the model for you.

Application:

(Explanations: Where the cooling towers will be used for?

 e.g. for HAVC system, Air Compressors, Melting Furnaces, etc.)

Water Flow Rate: (Explanations: How many Tons of water required per hour?)
Inlet Water Temp.: (Explanations: Temperature of hot water to be cooled)
Outlet Water Temp.:

(Explanations: Temperature of cooled water, 

usually it shall be at least 3~4 °C higher than the wet-bulb temp.) 

 Wet-bulb Temp.: (Explanations: Highest wet bulb temp. of the location/area or city to install the tower is essential to know to evaluate the size of towers)
Power Supply:

(Explanations: 380V/3 Phases is standard, which we could have

 in stock, but for customized towers, the delivery time could be longer)

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier