Customization: | Available |
---|---|
After-sales Service: | Field Installation, Commissioning and Training |
Warranty: | 2 Years |
Still deciding? Get samples of US$ 5000/set
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. High Performance: light weight, high strength, good flame retardant performance; corrosion resistance, new design, small ventilation resistance, strong hydrophilicity, large contact area.
2. Suitable temperature: 65 °C ~ - 35 °C
3. Application: square counter flow, mixed flow cooling towers
Material | PVC, PP |
Width | 750mm |
Flute | 15mm |
Length | Customized |
Samples | Free of charge |
MOQ | 500pcs |
1. Engineers are available for overseas service for installation and commisssioning of the equipment
2.. We can help you to train refrigeration operators for free.
3. Spare parts supply timely.
Why Choose HAC Cooling Tower ?
1. Our equipments are CE and CTI certified, Our company is ISO9001 certified.
2. 24 months warranty for the peroformance of the equipment
4. Factory price, overseas installation& maintenance service available.
5. Quick response within 12 hours
1.One of the biggest cooling tower & evaporative condenser manufacturers in China
Application | (Explanations: Where the cooling towers will be used for? e.g. for HAVC system, Air Compressors, Melting Furnaces, etc.) |
Water Flow Rate | (Explanations: How many Tons of water required per hour?) |
Inlet Water Temp. | (Explanations: Temperature of hot water to be cooled) |
Outlet Water Temp. | (Explanations: Temperature of cooled water, usually it shall be at least 3~4 °C higher than the wet-bulb temp.) |
Wet-bulb Temp. | (Explanations: Highest wet bulb temp. of the location/area or city to install the tower is essential to know to evaluate the size of towers) |
Power Supply | (Explanations: 380V/3 Phases is standard, which we could have in stock, but for customized towers, the delivery time could be longer) |