• Closed Circuit Cooling Tower Cross Flow Cooling Tower Customer Designed
  • Closed Circuit Cooling Tower Cross Flow Cooling Tower Customer Designed
  • Closed Circuit Cooling Tower Cross Flow Cooling Tower Customer Designed
  • Closed Circuit Cooling Tower Cross Flow Cooling Tower Customer Designed
  • Closed Circuit Cooling Tower Cross Flow Cooling Tower Customer Designed
  • Closed Circuit Cooling Tower Cross Flow Cooling Tower Customer Designed

Closed Circuit Cooling Tower Cross Flow Cooling Tower Customer Designed

After-sales Service: on-Site Installation
Warranty: 2 Years
Cooling Method: Cross Flow
Ventilation Mode: Mechanical Ventilation
Material: Metal
Air Contact Form: Wet and Dry
Samples:
US$ 4000/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2020

Suppliers with verified business licenses

Shandong, China
Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (22)
  • Overview
  • Product Description
  • Working Principles
  • Product Parameters
  • Detailed Photos
  • Production Process
  • Certifications
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
BHX
Air Contact Way
Closed
Tower Shape
Square
Noise Level
Low
Application Fields
Industrial
Certification
RoHS, UR, ISO, CE, CCC
Condition
New
Coil
Stainless Steel/Hot-DIP Al-Zn Alloy-Coated Steel
Coil Size
Diameter 25mm
Casing
SS304
Casing Thickness
2 mm
Motor
Siemens / Weg
Transport Package
Standard Seaworthy Container
Specification
3770*1840*4450
Trademark
HACST
Origin
China
HS Code
8419500090
Production Capacity
2000 Sets/Year

Product Description

Product Description

1 Excellent Heat Exchange Performance
   Parallel air and water path as well as the combination of coils and PVC fill, this effectively avoid the dry spot and scale formation, and improve the heat exchange performance.

2 Convenient Maintenance
   Huge maintenance space makes it convenient to inspect the product. Technicians can enter the cooling tower during operation time.

3 Convenient Transportation and Installation
   The cooling tower is designed to be standard upper body part and bottom body part, making it is able to be shipped separately and saves transportation and installation cost.

4 Slope Water Basin Design
   Suspended PVC fill and sloped water basin floor toward the drain facilitate cleaning.

 
Working Principles

 

Closed Circuit Cooling Tower Cross Flow Cooling Tower Customer Designed
Product Parameters

 

Model Capacity
(m³/h)
Axial Fan Water Spraying Pump Dimension (mm)
Qty Power (KW) Air Volume
Per Set (m³/h)
Qty Power (Kw) Water Volumr
Per Set (m³/h)
L W H
BHX-30 30 1 3 35000 1 1.1 36 1925 2380 4220
BHX-40 40 1 4 45000 1 1.1 45 1925 2380 4220
BHX-50 50 1 5.5 65000 1 1.1 45 1925 2350 4220
BHX-60 60 1 5.5 75000 1 1.5 65 1925 2900 4220
BHX-70 70 1 7.5 87000 1 1.5 65 1925 2900 4965
BHX-80 80 2 4 45000 1 2.2 84 3770 2200 4220
BHX-90 90 2 4 45000 1 2.2 84 3770 2200 4720
BHX-100 100 2 4 45000 1 2.2 84 3770 2200 4965
BHX-110 110 3 3 40000 1 3 120 4240 2200 4720
BHX-125 125 3 4 45000 1 3 120 4240 2200 4965
BHX-135 135 4 3 45000 1 3 120 5610 2200 4220
BHX-150 150 4 3 40000 1 3 120 5610 2200 4730
BHX-165 165 4 4 45000 1 3 120 5610 2200 4965
BHX-183 183 4 4 5000 1 4 170 7450 2200 4220
BHX-200 200 4 4 45000 1 5.5 230 7450 2200 4730
BHX-226 226 4 4 45000 1 5.5 230 7450 2200 4965
BHX-250 250 5 4 45000 1 5.5 230 9300 2200 4720
BHX-265 265 5 4 45000 1 5.5 230 9300 2200 4965
BHX-280 280 6 4 45000 1 5.5 230 9300 2200 4965
 
 
Detailed Photos

Closed Circuit Cooling Tower Cross Flow Cooling Tower Customer Designed
 
Production Process

Closed Circuit Cooling Tower Cross Flow Cooling Tower Customer Designed
 

Certifications

Closed Circuit Cooling Tower Cross Flow Cooling Tower Customer Designed
Packaging & Shipping

Closed Circuit Cooling Tower Cross Flow Cooling Tower Customer Designed

FAQ

1 Q: Is your company a manufacture or a trading company?

   A: We are a leading cooling tower manufacturer and trading combo with more than 40 years producing experience since 1975. 
       The famous brand-"Heng An" is well known not only China but all over the world.
       As a group company loacted in Weifang Citey of China, we have more than 1000 employees, area of 34hectares and total assets of USD 160 million.


2 Q: What is the difference between a "counter flow" and a "cross flow" cooling tower?

   A: The cross flow or counter flow designation characterizes the orientation of the airflow within the heat-transer medium (fill) in the tower with respect to the direction of water flow. In counter flow towers air travels vertically upwards through the fill and makes intimate contact with water droplets falling down through the fill. Hence the air and water travel in opposite directions.
        In cross flow cooling tower, the air passes through the fill medium in a horizontal direction, thus crossing the downward water flow.
        At same situation, counter flow tower are inherently more efficient than cross flow tower.


3 Q: How do you get repair parts and how long does it take?
   
   A: We have workshop and backup store supplying all parts. 90% of spare parts can be distributed to any plae on the world within one week.


4 Q: What if you don't have the professional engineers to install or maintain the tower?

    A: We could dispatch experienced engineer on site to install the towers and train your staff for tower operation and maintaince. 

5 Q: How can I choose a suitable cooling tower?

   A: If you are available to provide the following information, we can help you to choose the suitable cooling tower.

Application Which industry or system using for? For example, HAVC system, casting cooling system
Water flow capacity How many tons of water treatment per hour?
Inlet water temp. Tempreture of hot water to be cooled
Outlet water temp. Tempreture of cooled water, usually it would be at least 3-4 ºC higher than the bulb tempreture.
Wet bulb temp. Highest wet bulb temp. of the location/area or city to install the tower is essential to know to evaluate the size of towers.
Power supply The standard is 380V/3 phases and we have stock. But for customization, the delivery time would be longer.

 

 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2020

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
50
Year of Establishment
2012-01-13