Customization: | Available |
---|---|
After-sales Service: | Video Technical Support,Field Maintenance Repair |
Cooling Method: | Counter Flow |
Still deciding? Get samples of US$ 1/piect
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
PP PVC Filler for cross flow BAC, EVAPCO, SPINDLE Cooling Tower
Name | cooling tower fill |
Material | PVC, PP |
Width | 610mm, 720mm,813mm,915mm,1020mm,1120mm,1220mm,1320mm,1420mm,1520mm |
Regular Length | 1854mm.2060mm,2450mm,2678mm,2980mm,3090mm or customer request |
Thickness | 0.25-0.5mm |
Common Dimension | 1220mm*2980mm*0.38mm |
Color | black,gray |
Fluted size | 19mm |
Temperature | 60ºC-35ºC |
Packing Details | In bundle, wooden pallet or as requested |
Free Sample Delivery Time | 5-10dyas |
Production Date | Within 30days |
1.Q: Your company is a manufacture or trading company?
A: We are leading cooling towerand evaporative condenser manufacturer since the year of 1975 with the "famous brand"-Heng An manufacture in China.
2.Q: How do I get repair parts and how long does it take?
A: We have workshop can supply all parts of the product, and 90% of spare parts can be distributed to any
place in the world within one week!
3.Q: What if I don't have the professional engineer to install or maintain the product?
A: We could send experience engineers on site to install the product and train your staff for equipment
operation and maintenance.
4.Q: How can I choose a suitable model?
A: As long as you provide the following information, we can assist to design and select the model for you.
Application: |
(Explanations: Where the cooling towers will be used for? e.g. for HAVC system, Air Compressors, Melting Furnaces, etc.) |
|
Water Flow Rate: | (Explanations: How many Tons of water required per hour?) | |
Inlet Water Temp.: | (Explanations: Temperature of hot water to be cooled) | |
Outlet Water Temp.: |
(Explanations: Temperature of cooled water, usually it shall be at least 3~4 °C higher than the wet-bulb temp.) |
|
Wet-bulb Temp.: | (Explanations: Highest wet bulb temp. of the location/area or city to install the tower is essential to know to evaluate the size of towers) | |
Power Supply: |
(Explanations: 380V/3 Phases is standard, which we could have in stock, but for customized towers, the delivery time could be longer) |